MAISONInterior Design

Private condominium · Dairy Farm · West region

The Botany at Dairy Farm Renovation & Interior Design

The Botany at Dairy Farm is a condominium in District 23, with a listed address at Dairy Farm Walk, in the Hillview and Dairy Farm belt. The project file is not officially confirmed, so unit counts, tenure and the expected 2027 TOP carried from a third-party editorial list are left out of the facts below. Please use your sale documents for completion and key dates. We will not treat an editorial estimate as a confirmed handover. This page sets out what is on file and how to plan your The Botany at Dairy Farm renovation.

The Botany at Dairy Farm at a glance

Type
Private condominium
Area
Dairy Farm (D23)
Region
West
Address (as listed)
Dairy Farm Walk

This project is not marked officially confirmed in our project file. Unit counts, tenure and dates from third-party listings have been left blank until they can be cited from the developer, HDB or URA.

Facts from the sources listed at the end of this page.

Planning your The Botany at Dairy Farm interior

Dairy Farm Walk sits against a greener, hillier edge of the island. That is pleasant, and it also has practical design consequences: more reason to plan window treatments for weather and glare, to think about a bench or low cabinet under a living-room window, and not to assume every stack has the same outlook. We will not assign a view to your home without your key plan and a site visit. What we can prepare, once the approved floor plan is in hand, is the joinery that makes a new condo liveable: an entry shoe cabinet, a living-room storage wall, full-height wardrobes, and a fitted kitchen with a tall pantry. If a common bedroom will be a study, a built-in desk and wardrobe along one wall is usually cleaner than a loose table.

Maison is an interior designer. The carpentry is built in, detailed and photographed in the way a professional interior is finished, including closer shots of a wardrobe, a headboard wall or a kitchen counter when that is the decision you need to make. We do not use loose, flat-pack furniture as the main look, and we have no official floor-plan image on file to publish here.

Narra Residences is listed on the same road, and The Myst sits in the wider District 23 catchment, so owners in this belt often compare notes on management rules and contractor access. Those are still estate-specific; always read your own handbook. After keys, inspect defects first, then apply for renovation approval before anything is fabricated. A moderate, non-structural carpentry scope is often planned at about six to ten weeks on site after approvals — an editorial allowance only. Write to Maison with your plan when you are ready.

Planning your The Botany at Dairy Farm renovation

Defects check at handover

  • Your sale and purchase agreement sets the defects liability period, commonly 12 months from vacant possession. Check yours.
  • Inspect before your contractor starts, so new marks are not blamed on the renovation.
  • Check floors, walls, doors, windows, balcony glass, sealant, appliances, taps, water heater and air-conditioning.
  • Submit a list with photos through the developer's defects process and keep a copy.

What the rules allow

  • Renovation approval comes from the condo's management (the managing agent, then the MCST). Expect a form, a deposit and contractor registration.
  • Working hours are set by the condo's by-laws and are usually shorter than HDB's. Check them before booking work.
  • Changes seen from outside, such as balcony screens, grilles and the main door, need approval and must follow the approved design.
  • Structural changes need a professional engineer and building approvals.

Rules change, so we check the current version for your unit before we quote. Full new condo renovation guide

From keys to move-in

  1. 01

    Before keys 2 to 6 weeks

    Measurements from the floor plan, 3D drawings, quotation and the condo renovation application.

  2. 02

    Keys + defects 1 to 2 weeks

    Defects inspection and report, site measurements, MCST approval.

  3. 03

    Carpentry and electrical 3 to 4 weeks

    Built in the factory while lighting and power points are done on site.

  4. 04

    Install and finish 1 to 2 weeks

    Carpentry installation, curtains, lights and cleaning.

The Botany at Dairy Farm renovation FAQ

Is the completion or launch date for The Botany at Dairy Farm confirmed?

Not in our project file. This project is not officially confirmed, so unit counts, tenure and dates from third-party listings have been left blank. Use the developer’s documents for your own dates.

Do you have the The Botany at Dairy Farm floor plan?

No official floor-plan or site image is on file for this page, so none is published here. Please send your approved unit plan.

Can I renovate right after keys?

After handover, inspect defects and obtain the management corporation’s renovation approval first. A moderate carpentry scope is often planned at about six to ten weeks on site after access and approvals; that is an editorial allowance, not a guarantee.

What should I send Maison?

Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.

Sources

Facts checked against the sources on file, 11 November 2026.

Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at The Botany at Dairy Farm unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.

Talk to Maison

Planning your The Botany at Dairy Farm renovation?
WhatsApp Maison

WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).