MAISONInterior Design

Private condominium · Dairy Farm · West region

Narra Residences Renovation & Interior Design

Narra Residences is a condominium in District 23, with a listed address at Dairy Farm Walk. Our project file names the developer as Dairy Farm Walk JV Development, led by Apex Asia Development and Santarli Realty, and records a launch weekend at the end of January 2026 from a third-party report. Because this entry is not officially confirmed, unit counts, the number of shops, sell-through figures, prices and any estimated completion year from that report are left out of the facts below. A TOP or key date is not confirmed. If you have signed a purchase, use the developer’s documents for your own dates and typologies. This page sets out what is on file and how to plan your Narra Residences renovation.

Narra Residences at a glance

Type
Private condominium
Developer
Dairy Farm Walk JV Development (led by Apex Asia Development & Santarli Realty) (listed in our project file, not officially confirmed)
Area
Dairy Farm (D23)
Region
West
Address (as listed)
Dairy Farm Walk

This project is not marked officially confirmed in our project file. Unit counts, tenure and dates from third-party listings have been left blank until they can be cited from the developer, HDB or URA.

Facts from the sources listed at the end of this page.

Planning your Narra Residences interior

Dairy Farm Walk is a green, hilly edge of District 23, and The Botany at Dairy Farm is listed on the same road. Owners in this belt usually want a home that can take family life without fighting the landscape: storage for daily clutter, window treatments planned after you have seen the actual facing, and bedrooms that are properly fitted rather than left with a bed and a loose rack. The carpentry that typically does that work is an entry shoe cabinet, a living-room joinery wall, full-height wardrobes, and a fitted kitchen with a tall pantry. Where a common bedroom will also be a study, a built-in desk and wardrobe on one wall is cleaner than a loose table. Maison is an interior designer; we specify built-in carpentry, not flat-pack furniture, and we are as comfortable producing a close shot of a wardrobe or a kitchen run as a wide living-room view.

We have no official floor plan on file, so this page does not list typologies or room sizes, and we will not reconstruct a layout from marketing language. Check your approved plan for the real kitchen position, the air-conditioning ledges and the window line before any cabinet is drawn. Views towards the hill or the estate landscaping are not guaranteed from every stack.

Until a key date is in writing, the useful work is design, not demolition. When keys arrive, inspect defects, measure, and obtain management renovation approval before fabrication. A moderate, non-structural carpentry scope is often planned at about six to ten weeks on site after access and approvals — an editorial allowance, not a guarantee. WhatsApp Maison with your approved plan. We are not affiliated with the developer.

Planning your Narra Residences renovation

Defects check at handover

  • Your sale and purchase agreement sets the defects liability period, commonly 12 months from vacant possession. Check yours.
  • Inspect before your contractor starts, so new marks are not blamed on the renovation.
  • Check floors, walls, doors, windows, balcony glass, sealant, appliances, taps, water heater and air-conditioning.
  • Submit a list with photos through the developer's defects process and keep a copy.

What the rules allow

  • Renovation approval comes from the condo's management (the managing agent, then the MCST). Expect a form, a deposit and contractor registration.
  • Working hours are set by the condo's by-laws and are usually shorter than HDB's. Check them before booking work.
  • Changes seen from outside, such as balcony screens, grilles and the main door, need approval and must follow the approved design.
  • Structural changes need a professional engineer and building approvals.

Rules change, so we check the current version for your unit before we quote. Full new condo renovation guide

From keys to move-in

  1. 01

    Before keys 2 to 6 weeks

    Measurements from the floor plan, 3D drawings, quotation and the condo renovation application.

  2. 02

    Keys + defects 1 to 2 weeks

    Defects inspection and report, site measurements, MCST approval.

  3. 03

    Carpentry and electrical 3 to 4 weeks

    Built in the factory while lighting and power points are done on site.

  4. 04

    Install and finish 1 to 2 weeks

    Carpentry installation, curtains, lights and cleaning.

Narra Residences renovation FAQ

Is the completion or launch date for Narra Residences confirmed?

Not in our project file. This project is not officially confirmed, so unit counts, tenure and dates from third-party listings have been left blank. Use the developer’s documents for your own dates.

Do you have the Narra Residences floor plan?

No official floor-plan or site image is on file for this page, so none is published here. Please send your approved unit plan.

Can I renovate right after keys?

After handover, inspect defects and obtain the management corporation’s renovation approval first. A moderate carpentry scope is often planned at about six to ten weeks on site after access and approvals; that is an editorial allowance, not a guarantee.

What should I send Maison?

Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.

Sources

Facts checked against the sources on file, 11 November 2026.

Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Narra Residences unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.

Talk to Maison

Planning your Narra Residences renovation?
WhatsApp Maison

WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).