MAISONInterior Design

Office · Tanjong Pagar · Central region

Keppel South Central Fit-Out & Interior Design

Keppel South Central is an office building at 10 Hoe Chiang Road, in Tanjong Pagar, with Keppel recorded as the owner-developer in our project file. An official owner release, as cited in the file, records that the building was completed in January 2025 — not a 2026 TOP — and, at a 15 October 2026 lease-up snapshot, had approximately 60 per cent committed occupancy including documentation, with a further 20 per cent in negotiation. A second-quarter 2027 divestment completion recorded in the same file is a transaction date; it is not building completion and not a tenant handover date. This page sets out what is on file and how to plan your Keppel South Central fit-out.

Keppel South Central at a glance

Type
Office
Developer
Keppel
Launch / TOP / key date
Completed January 2025, not a 2026 TOP. Lease-up snapshot 15 October 2026
Area
Tanjong Pagar
Region
Central
Address
10 Hoe Chiang Road

Facts from the sources listed at the end of this page.

Planning your Keppel South Central interior

Because the building is already complete, the useful conversation with Maison is an office fit-out for a new or remaining tenant, not a home renovation and not a construction-progress story. Typical work, once a floor plate and the landlord’s manual are in hand, is a reception joinery wall, workstation storage, meeting-room carpentry, and a pantry run, specified as built-in work rather than as loose, flat-pack furniture. We can present that in a wide floor view or in closer shots of a reception or a pantry. No official floor plate is on file, so typologies and typical floor areas are left blank.

Newport Tower, IOI Central Boulevard Towers and 39 Robinson Road are nearby office links; The Island Residence and CanningHill Piers are nearby residential links only. We will not invent walking times to Tanjong Pagar MRT or to the city, and we will not treat a divestment date as permission to start works.

After a lease or access letter is in hand, record handover conditions, freeze the layout, obtain landlord consent and any fire-safety approvals the scope requires, then fabricate. A moderate office joinery scope is often planned at about six to ten weeks on site after approvals — an editorial allowance, not a guarantee. WhatsApp Maison with your floor plate and permitted use. We are not affiliated with Keppel.

Planning your Keppel South Central fit-out

Handover check

  • Ask the landlord for the handover condition in writing and walk the space against it.
  • Check ceilings, raised floors, air-conditioning outlets, sprinkler heads, power and data provisions.
  • Photograph existing marks and defects before your contractor starts.
  • Agree how and when landlord defects will be fixed so they do not hold up the fit-out.

Rules and approvals

  • The building's fit-out guidelines: approved contractors, insurance, deposits, hours and drawing submissions.
  • Changes to sprinklers, fire alarms or escape routes usually need a qualified person and SCDF approval.
  • Structural changes need BCA approval. If your use differs from the approved use, check URA's change-of-use rules.

Rules change, so we check the current version for your unit before we quote. Full office fit-out guide

From handover to opening

  1. 01

    Brief and layout 2 to 4 weeks

    Headcount, layout options, 3D views and an itemised quotation.

  2. 02

    Submissions 2 to 6 weeks

    Landlord drawings, and fire safety plans if needed.

  3. 03

    Build 4 to 8 weeks

    Partitions, ceilings, M&E, flooring and joinery.

  4. 04

    Handover 1 to 2 weeks

    Furniture, IT setup, defects and move-in.

Keppel South Central fit-out FAQ

When was the building completed?

Our file records completion in January 2025, not a 2026 TOP. A 2Q2027 divestment date is a transaction date, not building completion and not tenant handover.

Do you have a floor plan for Keppel South Central?

No official floor plan or tenancy / floor-plate drawing is on file for this page, so none is published here. Please send your approved tenancy or office plan.

Is this a home-renovation page?

No. The copy is angled at shop, office or F&B fit-out. Send a tenancy plan and permitted trade, not a residential brief, unless you actually have a home in a related development — in which case use that development’s own page.

What should I send Maison?

Your tenancy or floor-plate plan, permitted use, and any landlord fit-out manual or access date. WhatsApp us at https://wa.me/6593391185.

Sources

Facts checked against the sources on file, 11 November 2026.

Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Keppel South Central unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.

Talk to Maison

Planning your Keppel South Central fit-out?
WhatsApp Maison

WhatsApp Maison with your tenancy or floor-plate plan, permitted use, and any landlord fit-out manual or access date.