39 Robinson Road Fit-Out & Interior Design
39 Robinson Road is the refurbished former Robinson Point in the CBD, reported to complete in 2026. Tenants taking space in a refurbished building should plan their fit-out around what the refurbishment has upgraded and what it has kept. Below: key facts, what tenants usually change, a handover check and how to plan a 39 Robinson Road fit-out or renovation.
39 Robinson Road at a glance
- Type
- Office
- TOP
- Year only: expected 2026, as reported by EdgeProp. We could not confirm a date on an official page.
- Area
- Raffles Place
- Region
- Central
- Address
- 39 Robinson Road
- Type
- Office building, refurbished from the former Robinson Point
Facts from the sources listed at the end of this page.
What to know about 39 Robinson Road
In a refurbished office building the core services are usually upgraded, but floor plates, columns and window lines often stay as they were. A fit-out that works with those fixed points, rather than against them, costs less and gets approved faster.
CBD tenants often move on a tight timeline between leases. Ask the landlord for the fit-out guidelines and the handover condition early, so your design starts from what will actually be on site.
What tenants usually change
Common requests at 39 Robinson Road:
- Layouts planned around existing columns and window lines.
- Glass meeting rooms that keep daylight in the open office.
- Pantry and collaboration areas for hybrid teams.
- Data and power planned for flexible desks.
- Acoustic treatment for meeting rooms and phone booths.
Planning your 39 Robinson Road fit-out
Handover check
- Ask the landlord for the handover condition in writing and walk the space against it.
- Check ceilings, raised floors, air-conditioning outlets, sprinkler heads, power and data provisions.
- Photograph existing marks and defects before your contractor starts.
- Agree how and when landlord defects will be fixed so they do not hold up the fit-out.
Rules and approvals
- The building's fit-out guidelines: approved contractors, insurance, deposits, hours and drawing submissions.
- Changes to sprinklers, fire alarms or escape routes usually need a qualified person and SCDF approval.
- Structural changes need BCA approval. If your use differs from the approved use, check URA's change-of-use rules.
Rules change, so we check the current version for your unit before we quote. Full office fit-out guide
From handover to opening
- 01
Brief and layout 2 to 4 weeks
Headcount, layout options, 3D views and an itemised quotation.
- 02
Submissions 2 to 6 weeks
Landlord drawings, and fire safety plans if needed.
- 03
Build 4 to 8 weeks
Partitions, ceilings, M&E, flooring and joinery.
- 04
Handover 1 to 2 weeks
Furniture, IT setup, defects and move-in.
A typical office fit-out takes about 8 to 16 weeks from brief to move-in, including landlord submissions and any fire safety approvals.
39 Robinson Road fit-out FAQ
When will 39 Robinson Road be ready?
EdgeProp reported an expected TOP in 2026. We could not confirm this on an official page, so check with the landlord for your handover date.
What should we ask the landlord before designing?
The fit-out guidelines, the handover condition of the space, the approved working hours, and the submissions they need before work starts.
Do we need SCDF approval?
Only if the works change fire safety items such as sprinklers, alarms or escape routes. These need a qualified person and SCDF's approval.
Sources
Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at 39 Robinson Road unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.
Nearby new launches

Shaw Tower Beach Road
TOP secured; announced by Lendlease on 6 July 2026.
See the conceptsOffice · CBDIOI Central Boulevard Towers CBD
Renovation planning notes for new owners.
Read the guideOffice · Tanjong PagarKeppel South Central Tanjong Pagar
Completed January 2025, not a 2026 TOP.
Read the guideTalk to Maison
Planning your 39 Robinson Road fit-out?
WhatsApp Maison
Send your floor plan and your key or handover date. Roland and the team will reply with first ideas, a realistic timeline and an itemised quote.