HDB flat · Tengah · West region
Plantation Creek @ Tengah Renovation & Interior Design
Plantation Creek @ Tengah is an HDB project in Tengah, with a listed address at Tengah Garden Avenue / Tengah Boulevard. Our project file describes it as near completion and carries a third-party 2026 completion note, but this entry is not officially confirmed. Official HDB roadshow resources, checked in our file on 7 November 2026, do not confirm a project-wide TOP or key date, and key appointments are unconfirmed. Unit counts and any completion year are left out of the facts below. If you have an HDB key letter, use that. This page sets out what is on file and how to plan your Plantation Creek @ Tengah renovation.
Plantation Creek @ Tengah at a glance
- Type
- HDB flat
- Developer
- HDB (listed in our project file, not officially confirmed)
- Area
- Tengah
- Region
- West
- Address (as listed)
- Tengah Garden Avenue / Tengah Boulevard
This project is not marked officially confirmed in our project file. Unit counts, tenure and completion or key dates from third-party trackers have been left blank until they can be cited from HDB.
Facts from the sources listed at the end of this page.
Planning your Plantation Creek @ Tengah interior
Tengah is a new town that is still being built out, which has a practical effect on renovation: you may be among the earlier households in a landscape of new roads and, over time, new amenities, and the interior still has to work on day one. That usually means serious built-in storage — a fitted kitchen, full-height wardrobes, an entry cabinet, and a living-room joinery wall — rather than a temporary arrangement of loose furniture while you “see how the town develops”. Maison specifies that carpentry professionally, not as IKEA-style furniture, and we will draw it from your approved plan only. No official floor plan is on file, so typologies are not listed.
Garden Waterfront I & II @ Tengah and Plantation Verge are the other Tengah pages in this batch and are also unconfirmed for keys; do not copy a date from one page to another. Keat Hong Grange, already live in Choa Chu Kang, and Heart of Yew Tee are nearby western links. We will not invent walking times to any present or future MRT station, and we will not assign a water view from the name “Creek”.
After keys, inspect defects and obtain the HDB renovation permit before fabrication. A moderate carpentry scope is often planned at six to ten weeks on site after approvals, as an editorial figure only. WhatsApp Maison with your approved plan and any key letter you have. We are not affiliated with HDB.
Planning your Plantation Creek @ Tengah renovation
Defects check at handover
- Report defects within 30 days of key collection, before renovation starts (HDB move-in guide). The Defects Liability Period runs 1 year from key collection.
- Check floor and wall tiles for hollow or chipped pieces, plaster for cracks, and paint for stains.
- Test every door, window, lock, tap, floor trap, light point and power socket.
- Report through the QR code in your Welcome Kit or your project's Building Service Centre, with photos.
What the rules allow
- Use a contractor listed in HDB's Directory of Renovation Contractors; they can apply for the permit for you.
- A permit is needed for works such as removing floor finishes, raising floor levels in wet areas, or hacking or altering walls.
- For the first 3 years, toilet wall and floor finishes in a new BTO flat cannot be removed. New tiles can be overlaid.
- General works: Monday to Saturday, 9am to 6pm. Noisy works: Monday to Friday, 9am to 5pm. No works on Sundays or public holidays.
- Household shelter walls must not be hacked or drilled. Windows need a BCA-approved window contractor; air-conditioners need a BCA-trained installer.
Rules change, so we check the current version for your unit before we quote. Full bto key collection renovation guide
From keys to move-in
- 01
Before keys 4 to 8 weeks
Layout, 3D drawings and an itemised quotation, so work can start as soon as defects are reported.
- 02
Keys + first 2 weeks 1 to 2 weeks
Defects inspection and reporting, permit application, measurements on site.
- 03
Wet works and electrical 2 to 3 weeks
Tile overlays, screed or vinyl, wiring and plumbing points.
- 04
Carpentry 3 to 5 weeks
Built in the factory while wet works run on site, then installed.
- 05
Finishing 1 to 2 weeks
Painting, lights, glass, cleaning and a handover walk-through.
Plantation Creek @ Tengah renovation FAQ
Is the completion or key date for Plantation Creek @ Tengah confirmed?
Not in our project file. This project is not officially confirmed, so unit counts and tracker dates have been left blank. If you have an HDB key-appointment letter, use that.
Do you have the Plantation Creek @ Tengah floor plan?
No official floor-plan or site image is on file for this page, so none is published here. Please send your approved HDB unit plan.
Do I need an HDB renovation permit?
Yes, for the usual HDB renovation works. After keys, inspect defects, then apply for the permit with a registered contractor before carpentry is fabricated.
What should I send Maison?
Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.
Sources
- keydaykit.com: bto key collection 2026 2027 (third-party, not used as official confirmation)
- HDB renovation guide
- HDB move-in guide
Facts checked against the sources on file, 11 November 2026.
Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Plantation Creek @ Tengah unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.
Nearby new launches
Garden Waterfront I & II @ Tengah Tengah
Renovation planning notes for new owners.
Read the guideHDB flat · TengahPlantation Verge Tengah
Renovation planning notes for new owners.
Read the guideHDB BTO · Choa Chu KangKeat Hong Grange Choa Chu Kang
Year only: estimated 2026, from a third-party tracker.
Read the guideTalk to Maison
Planning your Plantation Creek @ Tengah renovation?
WhatsApp Maison
WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).