Hudson Place Residences Renovation & Interior Design

Hudson Place Residences is a condominium in District 5, in the one-north, Pasir Panjang and west-coast belt. Our project file records a launch in May 2026 from a third-party new-launch list. Because this entry is not officially confirmed, unit counts, tenure and that launch month are left out of the facts below, and no TOP or key date is confirmed. If you have purchased, use the developer’s documents, not a listing page, for completion and typologies. This page sets out what is on file and how to plan your Hudson Place Residences renovation.

Hudson Place Residences at a glance

Type
Private condominium
Area
District 5
Region
Central

This project is not marked officially confirmed in our project file. Unit counts, tenure and dates from third-party listings have been left blank until they can be cited from the developer, HDB or URA.

Facts from the sources listed at the end of this page.

Planning your Hudson Place Residences interior

District 5 sits between a business-park working life and older west-coast housing, so many owners here need a home that can take weekday work without turning the living room into a permanent office. The usual answer is built-in: a desk and storage wall in a common bedroom or a defined alcove, a living-room joinery wall that hides screens and cables, full-height wardrobes, and a kitchen of fitted cabinets with a tall pantry. Maison will design those pieces to your approved plan, as custom carpentry rather than loose, flat-pack furniture. We can show a full room or a closer study of a desk wall, a wardrobe interior or a kitchen counter, depending on what you need to decide.

No official floor plan is on file, so this page does not list typologies or room sizes. Blossoms by the Park, listed at Slim Barracks Rise in the same district, is a nearby page on this site; it is not a typologies reference for Hudson Place. We will also not invent walking times to one-north, to a motorway, or to any MRT station. Check your own stack, facing and the management handbook before you commit to blinds, a bench or a balcony screen.

When a key date is confirmed, work backwards: leave time for defects and rectification, a measured survey, renovation approval, and fabrication. A moderate carpentry scope is often planned at about six to ten weeks on site after approvals, as an editorial planning figure only. WhatsApp Maison with your unit type and approved plan when you have them. We are an independent designer and are not affiliated with the developer.

Planning your Hudson Place Residences renovation

Defects check at handover

  • Your sale and purchase agreement sets the defects liability period, commonly 12 months from vacant possession. Check yours.
  • Inspect before your contractor starts, so new marks are not blamed on the renovation.
  • Check floors, walls, doors, windows, balcony glass, sealant, appliances, taps, water heater and air-conditioning.
  • Submit a list with photos through the developer's defects process and keep a copy.

What the rules allow

  • Renovation approval comes from the condo's management (the managing agent, then the MCST). Expect a form, a deposit and contractor registration.
  • Working hours are set by the condo's by-laws and are usually shorter than HDB's. Check them before booking work.
  • Changes seen from outside, such as balcony screens, grilles and the main door, need approval and must follow the approved design.
  • Structural changes need a professional engineer and building approvals.

Rules change, so we check the current version for your unit before we quote. Full new condo renovation guide

From keys to move-in

  1. 01

    Before keys 2 to 6 weeks

    Measurements from the floor plan, 3D drawings, quotation and the condo renovation application.

  2. 02

    Keys + defects 1 to 2 weeks

    Defects inspection and report, site measurements, MCST approval.

  3. 03

    Carpentry and electrical 3 to 4 weeks

    Built in the factory while lighting and power points are done on site.

  4. 04

    Install and finish 1 to 2 weeks

    Carpentry installation, curtains, lights and cleaning.

Hudson Place Residences renovation FAQ

Is the completion or launch date for Hudson Place Residences confirmed?

Not in our project file. This project is not officially confirmed, so unit counts, tenure and dates from third-party listings have been left blank. Use the developer’s documents for your own dates.

Do you have the Hudson Place Residences floor plan?

No official floor-plan or site image is on file for this page, so none is published here. Please send your approved unit plan.

Can I renovate right after keys?

After handover, inspect defects and obtain the management corporation’s renovation approval first. A moderate carpentry scope is often planned at about six to ten weeks on site after access and approvals; that is an editorial allowance, not a guarantee.

What should I send Maison?

Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.

Sources

Facts checked against the sources on file, 11 November 2026.

Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Hudson Place Residences unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.

Talk to Maison

Planning your Hudson Place Residences renovation?
WhatsApp Maison

WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).