Executive condominium · Loyang · East region
Coastal Cabana Renovation & Interior Design
Coastal Cabana is an executive condominium in District 17, with a listed address at Jalan Loyang Besar, in the Loyang and Pasir Ris belt. Our project file names Qingjian Realty, Forsea Holdings, ZACD Group and Jianan Capital as the developers, and records a launch in January 2026 from a newspaper report. Because this entry is not officially confirmed, unit counts, tenure, sell-through figures and any price information from that report are left out of the facts below. A TOP or key date has not been confirmed. If you bought a home here, use the developer’s documents for your own completion and appointment dates, and ignore published prices when you brief a designer — we do not work from advertised psf figures. This page sets out what is on file and how to plan your Coastal Cabana renovation.
Coastal Cabana at a glance
- Type
- Executive condominium
- Developer
- Qingjian Realty, Forsea Holdings, ZACD Group & Jianan Capital (listed in our project file, not officially confirmed)
- Area
- Loyang (D17)
- Region
- East
- Address (as listed)
- Jalan Loyang Besar
This project is not marked officially confirmed in our project file. Unit counts, tenure and dates from third-party listings have been left blank until they can be cited from the developer, HDB or URA.
Facts from the sources listed at the end of this page.
Planning your Coastal Cabana interior
East-facing coastal estates often bring a simple, useful design brief: plan for weather at the windows, keep floors practical, and build storage for family life — sports gear, school bags, bulk household goods — rather than decorating around a show-flat sofa. The joinery that usually carries that brief is an entry cabinet, a living-room storage wall, full-height bedroom wardrobes, and a fitted kitchen with a tall pantry. If a common room will be a study or a child’s room, a built-in desk along the window wall is more stable than a loose table. Maison specifies this as built-in carpentry, not as flat-pack furniture, and we can present the look in a wide room view or in closer material shots.
We have no official floor plan on file and will not invent typologies for this estate. Jalan Loyang Besar is a real road in a quieter eastern corner of the island; walking times to the beach, to Pasir Ris town, or to any MRT station are not something we will guess. Check your stack, facing and the management rules on balcony use before you plan screens, benches or outdoor cabinets.
Once a key date is in writing, the sequence is defects inspection, a measured survey, the management renovation application, then fabrication. A moderate carpentry scope is often planned at about six to ten weeks on site after approvals; that is an editorial allowance, not a promise. WhatsApp Maison with your approved plan and, if you have it, the key letter. We are not affiliated with the developers.
Planning your Coastal Cabana renovation
Defects check at handover
- Your sale and purchase agreement sets the defects liability period, commonly 12 months from vacant possession. Check yours.
- Inspect before your contractor starts, so new marks are not blamed on the renovation.
- Check floors, walls, doors, windows, balcony glass, sealant, appliances, taps, water heater and air-conditioning.
- Submit a list with photos through the developer's defects process and keep a copy.
What the rules allow
- Renovation approval comes from the condo's management (the managing agent, then the MCST). Expect a form, a deposit and contractor registration.
- Working hours are set by the condo's by-laws and are usually shorter than HDB's. Check them before booking work.
- Changes seen from outside, such as balcony screens, grilles and the main door, need approval and must follow the approved design.
- Structural changes need a professional engineer and building approvals.
- Executive condominiums follow the condo's rules, not HDB's renovation permits.
Rules change, so we check the current version for your unit before we quote. Full new condo renovation guide
From keys to move-in
- 01
Before keys 2 to 6 weeks
Measurements from the floor plan, 3D drawings, quotation and the condo renovation application.
- 02
Keys + defects 1 to 2 weeks
Defects inspection and report, site measurements, MCST approval.
- 03
Carpentry and electrical 3 to 4 weeks
Built in the factory while lighting and power points are done on site.
- 04
Install and finish 1 to 2 weeks
Carpentry installation, curtains, lights and cleaning.
Coastal Cabana renovation FAQ
Is the completion or launch date for Coastal Cabana confirmed?
Not in our project file. This project is not officially confirmed, so unit counts, tenure and dates from third-party listings have been left blank. Use the developer’s documents for your own dates.
Do you have the Coastal Cabana floor plan?
No official floor-plan or site image is on file for this page, so none is published here. Please send your approved unit plan.
Can I renovate right after keys?
After handover, inspect defects and obtain the management corporation’s renovation approval first. A moderate carpentry scope is often planned at about six to ten weeks on site after access and approvals; that is an editorial allowance, not a guarantee.
What should I send Maison?
Your approved floor plan, unit type if you have it, and a key date if one is already in writing. WhatsApp us at https://wa.me/6593391185.
Sources
Facts checked against the sources on file, 11 November 2026.
Maison Interior Design is an independent interior design firm. We are not appointed by, or affiliated with, the developer, HDB or the building's owner. We have not worked at Coastal Cabana unless our portfolio says so. Concept pictures are AI-generated style concepts, not photos of a finished unit.
Nearby new launches
Rivelle Tampines Tampines
Renovation planning notes for new owners.
Read the guidePrivate condominium · District 16Pinery Residences District 16
Renovation planning notes for new owners.
Read the guidePrivate condominium · District 16Vela Bay District 16
Renovation planning notes for new owners.
Read the guideTalk to Maison
Planning your Coastal Cabana renovation?
WhatsApp Maison
WhatsApp Maison with your unit type, approved floor plan and key date (if you have one).