New Launch Condo Renovation Singapore: Plan from the Floor Plan Up

3 min readMaison Interior Design

New launch condo renovation in Singapore starts with the layout you are given. Our new condo page says a new condo or executive condominium usually comes with floors, kitchen and bathrooms already finished, so the work is lighter than a BTO. The detail is in what you add. This short guide restates what our own pages say. We have kept it to those lines on purpose.

Illustrative photograph, no text, for: New Launch Condo Renovation Singapore: Plan from the Floor Plan Up

Start with the floor plan

Our page says the detail is in storage, lighting and furniture that fit the layout. That is why the floor plan is the first thing to have in hand.

If you are still choosing a project, see our New launches page.

What new condo owners usually change

Our new condo page lists these common changes:

  • Wardrobe internals, extra storage in the bedrooms and a full-height shoe and utility cabinet at the entrance.
  • Lighting: cove lights, track lights or pendant points to replace the basic ceiling lights.
  • Feature walls and a TV console sized to the living room, with hidden cabling.
  • Window treatments: curtains, blinds or sheers sized to the full window.
  • Balcony: flooring tiles or decking, and a balcony screen only if it follows the design the condo management allows.

The page adds that owners renting out a unit often keep it simple: durable finishes, good storage and furniture that suits tenants.

See it in 3D before work starts

Our site says every room is drawn in 3D before work starts. Our services page lists perspective 3D drawings room by room, a colour and material proposal, and revisions before the quotation is final. Read more under 3D design and visualisation.

The rules come from the condo, not HDB

Our page says renovations are approved by the condo's management (the managing agent, then the MCST once it is formed). It says to expect an application form, a deposit, contractor registration and lift protection.

It also says working hours are set by the condo's by-laws, and that anything changing the building's look from outside usually needs management approval. Check your condo's rules before booking work.

Check for defects before the contractor starts

Our page says developers' sale and purchase agreements usually include a defects liability period of 12 months from vacant possession. Check yours for the exact terms.

It also advises inspecting before your contractor starts, so new defects are not blamed on your renovation. List everything with photos, submit it through the developer's defects process, and keep a copy.

The timeline stages we list

Our new condo page sets out four stages:

  • Before keys: 2 to 6 weeks
  • Keys and defects: 1 to 2 weeks
  • Carpentry and electrical: 3 to 4 weeks
  • Install and finish: 1 to 2 weeks

Good to know

Quick answers

Is a new launch condo renovation bigger than a BTO renovation?

Our page says the work is lighter than a BTO, because floors, kitchen and bathrooms usually come finished. The detail is in the storage, lighting and furniture you add.

Who approves renovations in a new condo?

Our page says the condo's management approves them: the managing agent, then the MCST once it is formed. The rules come from the condo's management, not HDB.

Do executive condominiums follow HDB renovation permits?

Our page says they follow the condo's rules, not HDB's renovation permits.

What should I send when I first get in touch?

Our site says to send your floor plan and a few photos you like. You can reach us through Let's talk about your space.

Planning a new launch condo renovation? Message Maison Interior Design on WhatsApp: chat with us

Talk to Maison

Planning your space?
WhatsApp Maison

Send your floor plan and your key or handover date. Roland and the team will reply with first ideas, a realistic timeline and an itemised quote.