Planning a renovation

Landed House Renovation Singapore: What to Consider First

3 min readMaison Interior Design

Landed house renovation in Singapore ranges from interior work on a sound house to additions and alterations. Which end of that range you are on is the first thing to settle. This article sets out what Maison's own pages say about it, and leaves the official rules to URA and BCA.

Illustrative photograph, no text, for: Landed House Renovation Singapore: What to Consider First

Start with the scope of work

Maison's landed renovation page says a landed house gives you more room to change things, and more to get right. It says interior work on a sound house is close to a large condo job. Additions and alterations, such as extending a floor or adding a roof terrace, bring in architects, engineers and approvals.

Ask yourself whether you are changing the inside of the house or changing the building itself.

What the work usually involves

The site lists these areas for landed work:

  • Interior renovation: kitchen, bathrooms, flooring, built-in storage, lighting and air-conditioning.
  • Additions and alterations: extending a floor, an attic or a roof terrace, new staircases or reconfigured rooms.
  • Outside: gates, fencing, car porch, facade finishes and waterproofing of flat roofs and terraces.
  • Services: rewiring, new water pipes and drainage are common in older houses.

Approvals: check the official sources

Our page says building works that change the structure or add floor area usually need a qualified person, such as an architect or professional engineer, to submit plans to the authorities. It names URA for planning and BCA for building plans and structure.

Rules differ from house to house, so this article does not state them. Check URA and BCA directly for the current requirements that apply to your property.

Timeline: scope sets the figure

Our landed renovation page says an interior-only landed renovation often takes about 3 to 4 months. It says additions and alterations with approvals usually take 6 to 12 months. It adds that your scope sets the real figure.

Design and building under one team

Our page says our builder team mainly builds landed houses, so we plan the interior and any building work together. Maison's footer describes the business as residential and commercial interior design, and landed house building, in Singapore since 2018.

You can read more on our Landed homes page or see the Services list. See Landed Home Holland in our portfolio.

Talk to Maison

To discuss your landed house, see our Contact page or message us on WhatsApp.

Maison Interior Design: WhatsApp us about your landed house

Good to know

Quick answers

Do I need approval to renovate my landed house?

Our site says interior work often does not need approval. Structural changes and extra floor area usually need plans submitted by a qualified person to URA and BCA. We check what applies to your house before quoting, and the official sources remain the reference.

How long does a landed house renovation take?

Our landed renovation page says an interior-only job often takes about 3 to 4 months. Additions and alterations with approvals usually take 6 to 12 months, and your scope sets the real figure.

Who handles the building work and the interior together?

Our page says our builder team mainly builds landed houses, so we plan the interior and any building work together.

What about a strata landed home?

Our page says strata landed homes in a cluster development add another layer. The MCST controls the facade and shared areas, and its approval is needed for anything that changes the outside of the house.