An HDB renovation permit is the approval HDB requires before certain renovation works start in your flat. Its purpose is to keep the building safe and to protect the structure shared by every household in the block. Check the current rules with HDB before any work begins. This guide explains what the permit is for and what to ask before you sign anything. It does not quote fees or timelines, because those can change. For the current figures, use the official HDB website.

Illustrative photograph, no text, for: HDB renovation permit: what homeowners should check

What an HDB renovation permit is for

HDB flats are not fully private structures. Walls, floors, pipes and the building frame are part of a larger block. Some works can affect neighbours or the structure, so HDB wants to know about them first.

The permit is how HDB reviews those works before they happen. It is not a formality to sort out afterwards. Starting restricted works without approval can cause problems with HDB, so confirm the position first.

Not every job needs a permit

Many renovations involve a mix of works. Some need HDB approval and some do not. HDB decides which is which, and its guidelines can be updated.

Do not rely on a friend's experience or an old forum post. Your flat type, your layout and the works you want all matter. Check HDB's current renovation guidelines for the up-to-date position.

What to check before work starts

Go through these points before you commit to a renovation plan.

1. Which of your planned works need approval

Write down every change you want, from flooring to walls to wet areas. Then check each one against HDB's current guidelines. If you are unsure about an item, ask HDB or your designer before you finalise the plan.

2. Who submits the permit application

Ask your designer or contractor directly who files the application, and when. Do not assume it is covered. A clear answer up front avoids delays later.

Maison Interior Design handles the HDB renovation permit application for its clients as part of the process. If you work with another firm, ask them the same question and get the answer in writing.

3. Whether the permit is reflected in the schedule

Works that need approval cannot start until it is in place. Your timeline should reflect this. Ask how the permit step fits into the overall schedule, and do not set a hard move-in or key-collection deadline before you know.

HDB sets its own processing times. Check its website for the current position instead of relying on a number quoted by someone else.

4. Whether the contractors are allowed to do the work

HDB has its own requirements for who can carry out certain renovation works. Check HDB's renovation guidelines for the current rules, and ask your contractor to confirm they meet them for your project.

5. What your quotation says about the permit

Your quotation should make clear what is included and what is not. If permit-related costs or HDB fees apply, they should be listed or explained clearly, not left as a surprise. Our guide on reading an itemised renovation quotation shows what a clear breakdown looks like.

Where to find current fees and timelines

Fees, processing times and the list of works that need approval are set by HDB. They can change, so any article that quotes a fixed number can go out of date.

Use the official HDB website for the current renovation guidelines, then compare what you find against your quotation and schedule. If something does not match, ask your designer to explain.

Renovation loans and the permit

Many homeowners plan the renovation budget and the permit together. Maison helps with a renovation loan application as part of the process. Loan terms depend on the lender and your own situation, so we do not quote any figures here. Check the terms with the lender before you commit.

How to prepare before you speak to a designer

You will get more useful answers if you arrive with a clear idea of what you want to change. Bring your floor plan, a list of must-have works and your target move-in timing. Our guide on how to prepare for an interior design consultation lists what to have ready.

You can also see what we offer on our services page.

Good to know

Quick answers

Do I always need an HDB renovation permit?

Not always. It depends on the works you plan. HDB decides which works need approval, so check its current guidelines on the official HDB website before you finalise your plan.

How much does an HDB renovation permit cost?

We do not quote a figure, because fees are set by HDB and can change. Check the HDB website for the current fee, and ask your designer to show any permit-related cost clearly in your quotation.

How long does the permit take?

Processing time is set by HDB and can vary. Check HDB for the current position, and ask your designer how the permit step fits into your schedule before you set any deadlines.

Does Maison handle the permit application?

Yes. Maison's team handles the HDB renovation permit application and helps with a renovation loan application as part of the process. If you want to discuss your project, you can contact us.

What happens if I start works before approval?

Check HDB's current rules and the consequences of non-compliance on its website. In general, the safest approach is to wait for approval before starting any work that needs it.

Talk to Maison Interior Design about your HDB renovation: message us on WhatsApp

Talk to Maison

Planning your space?
WhatsApp Maison

Send your floor plan and your key or handover date. Roland and the team will reply with first ideas, a realistic timeline and an itemised quote.