BTO Renovation Order of Works: What to Do First After Getting Your Keys

3 min readMaison Interior Design

The BTO renovation order of works matters after key collection. Our BTO key collection page says the weeks after you collect your keys decide how smoothly the rest goes. This article walks through the points that page covers.

Illustrative photograph, no text, for: BTO Renovation Order of Works: What to Do First After Getting Your Keys

Defects check at handover

HDB's move-in guide, as quoted on our BTO page, says new BTO flats have a 1-year Defects Liability Period from your key collection date. It also says you must report defects within 30 days of key collection, before renovation starts.

So the defects check comes before any renovation work.

Permit

Our BTO page says "some works need a permit before anyone lifts a hammer." Maison handles the HDB renovation permit application as part of the process, and helps with a renovation loan application too. Permit rules can change, so check them with HDB.

Plan your points before carpentry

Plan lighting points, power points and data points before carpentry starts. The reason our page gives is that cables then hide inside the cabinets.

Stages and durations

Our BTO page lists these stages and durations:

  • Before keys: 4 to 8 weeks
  • Keys + first 2 weeks: 1 to 2 weeks
  • Wet works and electrical: 2 to 3 weeks
  • Carpentry: 3 to 5 weeks
  • Finishing: 1 to 2 weeks

These are the durations the site states. Your own timeline is not covered here.

Two rules to keep in mind

  • Our page says noisy work is only allowed on weekdays.
  • Our page says that for the first 3 years HDB does not allow you to remove wall or floor finishes in the toilets, so new tiles go over the old ones.

These are HDB rules and can change, so check the current rules on the HDB website before you plan.

See it before it is built

Our home page says every room is drawn in 3D before work starts. For how we put a quotation together, see Itemised renovation quotation. For the full list of what we do, see Services.

Talk to us

To discuss your BTO renovation, see Contact or message us on WhatsApp.

Maison Interior Design: WhatsApp us

Good to know

Quick answers

How long do I have to report defects after collecting my BTO keys?

HDB's move-in guide, quoted on our BTO page, says you must report defects within 30 days of key collection, before renovation starts.

Does Maison apply for the HDB renovation permit?

Yes. Our live site says the team handles the HDB renovation permit application and helps with a renovation loan application as part of the process.

Why plan lighting, power and data points before carpentry?

Our BTO page says these points are planned before carpentry so cables hide inside the cabinets.

Can I do noisy renovation work on weekends?

Our BTO page says noisy work is only allowed on weekdays. This is an HDB rule that can change, so check the HDB website.